Foundation

  • It is made according to foundation projects and geotechnical studies:
  • in the ground (120 cm):
    1. concrete equalizer in ditches digged for housed bearings;
    2. armed housed bearings;
    3. crossbeam connection between bearings and all intersections. .

  • Above ground (100 - 120 cm):
    1. continue armed beams to share finite;
    2. isolate perimetral all the spaces between the concrete beams, inside them;
    3. fill with soil and compacting;
    4. fill with washed stone, approximately 20 cm and compacting;
    5. isolate the entire area with expanded polystyrene by 5cm;
    6. place the polyethylene foil;
    7. install reinforcement for the board;
    8. pour the board.


Note: The concrete used is ordered in concrete station, the quality of the draft resistance and is cast with the vibration pump.